End of mission




According to the Outer Space Treaty, the United States and Russia are legally responsible for all modules they have launched. Natural orbital decay with random reentry (as with Skylab), boosting the station to a higher altitude (which would delay reentry), and a controlled targeted de-orbit to a remote ocean area were considered as ISS disposal options. As of late 2010, the preferred plan is to use a slightly modified Progress spacecraft to de-orbit the ISS. This plan was seen as the simplest, cheapest and with the highest margin.

The Orbital Piloted Assembly and Experiment Complex (OPSEK) was previously intended to be constructed of modules from the Russian Orbital Segment after the ISS is decommissioned. The modules under consideration for removal from the current ISS included the Multipurpose Laboratory Module (Nauka), planned to be launched in spring 2021 as of May 2020update, and the other new Russian modules that are proposed to be attached to Nauka. These newly launched modules would still be well within their useful lives in 2024.

At the end of 2011, the Exploration Gateway Platform concept also proposed using leftover USOS hardware and Zvezda 2 as a refuelling depot and service station located at one of the Earth-Moon Lagrange points. However, the entire USOS was not designed for disassembly and will be discarded.

In February 2015, Roscosmos announced that it would remain a part of the ISS programme until 2024. Nine months earlier—in response to US sanctions against Russia over the annexation of Crimea—Russian Deputy Prime Minister Dmitry Rogozin had stated that Russia would reject a US request to prolong the orbiting station's use beyond 2020, and would only supply rocket engines to the US for non-military satellite launches.

On 28 March 2015, Russian sources announced that Roscosmos and NASA had agreed to collaborate on the development of a replacement for the current ISS. Igor Komarov, the head of Russia's Roscosmos, made the announcement with NASA administrator Charles Bolden at his side. In a statement provided to SpaceNews on 28 March, NASA spokesman David Weaver said the agency appreciated the Russian commitment to extending the ISS, but did not confirm any plans for a future space station.

On 30 September 2015, Boeing's contract with NASA as prime contractor for the ISS was extended to 30 September 2020. Part of Boeing's services under the contract will relate to extending the station's primary structural hardware past 2020 to the end of 2028.

Regarding extending the ISS, on 15 November 2016 General Director Vladimir Solntsev of RSC Energia stated "Maybe the ISS will receive continued resources. Today we discussed the possibility of using the station until 2028", with discussion to continue under the new presidential administration.citation needed There have also been suggestions that the station could be converted to commercial operations after it is retired by government entities.

In July 2018, the Space Frontier Act of 2018 was intended to extend operations of the ISS to 2030. This bill was unanimously approved in the Senate, but failed to pass in the U.S. House. In September 2018, the Leading Human Spaceflight Act was introduced with the intent to extend operations of the ISS to 2030, and was confirmed in December 2018.

Comments

Popular posts from this blog

Structure

Purpose

Onboard systems